2021

  • VSB Neue Energien Deutschland GmbH
    Verification of the design of the cable from the wind farm’s switching station to the substation (more)
  • SB Neue Energien Deutschland GmbH
    Calculation of the maximum feed-in power at 110 kV grid interconnection point (more)

2020

  • B+S Grid Solutions, InnoVent Planungs GmbH & Co. KG
    Loss calculation for the Schwennenz wind farm (more)
  • Westfalen Weser Netz GmbH, EWE Netz GmbH, EAM Netz GmbH, wesernetz Bremen GmbH
    Thermal dimensioning of the earthing conductors between transformer tank and earthing bar (more)
  • TransnetBW GmbH
    Development of an evaluation tool for INTEGRAL Time Series Simulations (more)
  • FP Lux Solar GmbH & Co. Krempendorf KG
    Consulting for plant certification Krempendorf III (more)

2019

  • TransnetBW GmbH
    Support in regional target network planning for 2030 (more)
  • TransnetBW GmbH
    Network reinforcement of the Badische Rheinschiene (more)